Gee Library Heaf Funds 2001-2002 |
|
Description of Item Requested |
Number Requested |
Unit Cost |
Total Cost |
Rationale for Purchase |
|||||
|
GEE LIBRARY |
|||||||||
|
Non-Computer Priorities: |
|||||||||
|
Shelving |
1 |
$10,000 |
$10,000 |
Miscl. Shelving for expanded collections |
|||||
|
Small booktrucks for staff areas in technical services |
6 |
$165 |
$990 |
Cramped work spaces rmake current equipment awkward and sometimes impossible to use within department. |
|||||
|
Instructor Station for BI classroom |
1 |
$1,084 |
$1,084 |
To complete training lab with corresponding ergonomic teacher's station. |
|||||
|
Subtotal: |
$12,074 |
||||||||
|
Computer Priorities: |
|||||||||
|
PC's for Public Areas |
20 |
$1,200 |
$24,000 |
Upgrades and replacements for existing public PCs |
|||||
|
Laser Printers (Staff and Public) |
4 |
$1,500 |
$6,000 |
Upgrades and Replacements. 1. Increased demand for LAN and Internet printing; 2. Increased staff needs for printing support. |
|||||
|
Access Machines in Reference areas (Mesquite) |
4 |
$2,000 |
$8,000 |
Additional Stations: 1. Increased demand for electronic library access; 2. Increased knowledge of electronic products; 3. Changes in DRA Lion system to require PCs instead of terminals. |
|||||
|
Computer Projectors for BI sessions |
2 |
$4,980 |
$9,960 |
Increasing demand for demos of library databases outside of the library; Replacement of current equipment in Lib325 |
|||||
|
Windows NT Workstations |
3 |
$2,000 |
$6,000 |
Complete the Upgrade of pre-NT staff equipment for easier migration to client/server software for DRA upgrade [target: Summer 2001] |
|||||
|
Subtotal: |
$53,960 |
||||||||
|
GEE LIBRARY TOTAL: |
$66,034.00 |
2000/2001: |
|||||||
|
$31,580 |
|||||||||
|
GEE LIBRARY COMPUTER LABORATORY (GENERAL STUDENT ACCESS) |
|||||||||
|
Computer Lab Upgrades |
|||||||||
|
MAC Replacement |
1 |
$3,200 |
$3,200 |
Upgrades & Replacements |
|||||
|
PC Replacements |
12 |
$1,200 |
$14,400 |
Upgrades & Replacements |
|||||
|
Subtotal: |
$17,600.00 |
2000/2001: $6,000 |
|||||||
|
TOTAL GEE LIBRARY HEAF EQUIPMENT REQUEST: |
$83,634.00 |
2000/2001: $37,580 |
|||||||
|
Description of Item Requested |
Number Requested |
Unit Cost |
Total Cost |
Rationale for Purchase |
|||||
|
CAMPUS ENGINEER |
|||||||||
|
Engineering Replacement Equipment |
1 |
$5,000 |
$5,000 |
Parts and upgraded repair equipment to maintain KETR and Campus electronic equipment [non-computer], including maintenance of multimedia classroom equipment. |
|||||
|
Total: |
$5,000 |
2000/2001: $7,500 |
|
||||||
|
MEDIA SERVICES |
|||||||||
|
Computer Equipment: |
|||||||||
|
Computer Projectors |
8 |
$4,980 |
$39,840 |
Increase and Update Inventory, including Metroplex |
|||||
|
Subtotal: |
$39,840 |
||||||||
|
Non-Computer Equipment: |
|||||||||
|
Monitors 27" (S-VHS Input) |
6 |
$495 |
$2,970 |
Replace and Update Inventory to support Use With DP Link |
|||||
|
TV/VCR Combinations |
5 |
$462 |
$2,310 |
Replace and Update Inventory |
|||||
|
Overhead Projectors |
17 |
$130 |
$2,210 |
Replace and Update Inventory |
|||||
|
Video Recorder (VCR) |
6 |
$228 |
$1,368 |
Increase and Update Inventory |
|||||
|
Cassette Recorders |
20 |
$68 |
$1,360 |
Replace and Update Inventory |
|||||
|
Subtotal: |
$10,218 |
||||||||
|
TOTAL: |
$50,058 |
2000/2001: $49,120 |
|||||||
|
$138,692.00 |
|||||||||
|
40 |
75 |
50 |
||
|
Sauder |
||||
|
Plyfold |
||||
|
702-8201 |
$247 |
$232 |
$247 |
|
|
Cal TB-133 |
$8 |
$8 |
$8 |
|
|
Mois.Barr. |
$6 |
$6 |
$6 |
|
|
Item Cost |
$261 |
$246 |
$261 |
|
|
Total: |
$10,440 |
$18,450 |
$13,050 |
|
|
Dolly |
||||
|
703-4126 |
$492 |
|||
|
Extension: |
||||
|
703-4003 |
$107 |
|||
|
Total for 20 chairs |
$599 |
|||
|
$1,198 |
$2,396 |
$1,797 |
||
|
Project Total: |
$11,638 |
$20,846 |
$14,847 |
|
Defer to Special Item Requests, 1999-2001: |
|||||||||||
|
DRA Replacement System Software |
1 |
$31,715 |
Functional Components (from 1998/99) including |
||||||||
|
1 |
$18,000 |
$18,000 |
Media Booking |
||||||||
|
1 |
$50,000 |
$50,000 |
& Electronic Reserves |
may be external system |
|||||||
|
Orbix Operating System |
1 |
$5,260 |
(purchase in 1998/99) |
||||||||
|
DRA Replacement Training Srvs. |
1 |
$5,000 |
$5,000 |
On-Site TAOS System training sessions |
|||||||
|
DRA Hardware Components - CTIS |
1 |
$39,430 |
(purchase in 1998/99) |
||||||||
|
$76,405 |
|||||||||||
|
Workstation Upgrades (year 1-2) |
|||||||||||
|
Windows NT Workstations |
24 |
$2,500 |
$60,000 |
Estimate |
|||||||
|
Upgrade terminals and pre-486 PCs with current std office PC. |
|||||||||||
|
Easier migration to client/server software when upgrading DRA |
|||||||||||
|
Access Machines in Reference areas (Commerce) |
30 |
$2,000 |
$60,000 |
Replacements. |
|||||||
|
1. Increased demand for electronic access. |
|||||||||||
|
2. Incr. knowledge of electronic products. |
|||||||||||
|
3. Changes to DRA Lion system to require public PCs. |
|||||||||||
|
Access Machines in Reference areas (Mesquite) |
8 |
$2,000 |
$16,000 |
Upgrades and Replacements.ss. |
|||||||
|
1. Increased demand for electronic access. |
|||||||||||
|
2. Incr. knowledge of electronic products. |
|||||||||||
|
3. Changes to DRA Lion system to require public PCs. |
|||||||||||
|
Travel for training. |
|||||||||||
|
$209,000 |
|||||||||||
|
Maintenance would be modified immediately as part of upgrade of equipment |
$12,000 |
||||||||||