SUMMARY OF GOAL ACHIEVEMENT:

Gee Library, 1997/98

 

Goal 1: Continue to increase access to electronic sources.

Databases added as Internet or WAN products for campus-wide use in 1997/98:

Internet:

FactSearch FirstSearch Sept. 1997

MLA Bibliographic FirstSearch Sept. 1997

World Almanac FirstSearch Sept. 1997

Wilson Select Full Text FirstSearch Sept. 1997

Special Collections USA TexShare July 1998

Lexis/Nexis July 1998

Project Muse Full Text August 1997

IDEAL Full Text January 1998

Upgraded Wilson Indexes via TAMUS to include abstracts, October 1997

 

WAN:

ERIC, WinSPIRS or MacSPIRS version

Mental Measurements Yearbook

Women ‘R’, became Gender Watch in Sept. 1998

SIRS Databases

Social Issues Resources Series, Inc. (SIRS) K-12 and lower division resources for current affairs and historical research:

SIRS Researcher CD-ROM

SIRS Discoverer CD-ROM

SIRS Renaissance CD-ROM

SIRS Government Reporter

Occupational Outlook Handbook

Statistical Abstract of US

Foreign Relations of US

Will be gathering more data from Bibliographic Instruction sessions to determine alternative instructional support needed for optimal use of these various resources.

 

Goal 2: Serials Collection Control

Made substantial progress in upgrading issue-level holdings data within LION.

Made substantial progress in providing claim letters and other missing issue support within DRA serials subsystem.

 

Goal 3: Assessment of Distance Education Support Needs

Received input from NETP Survey of Faculty and Distance Students that library support needs are being met.

Failed to complete hiring of Distance Education/Systems Librarian who will have major responsibility for identifying new service options for this student audience.

CTIS provided Proxy Server solution for distance access to TAMU-C electronic library resources.

 

Goal 4: Restructure library and support staff to provide for improved delivery of services to faculty and students

We have continued to produce effective library support with minimal staffing. Further adjustments dependent upon facility renovation.

Instructional Multimedia transferred to NETP effective June 1, 1998.

 

Goal 5: Work on inclusion within campus kiosks.

Demonstration of virtual library tour complete; will be incorporated in library web page.

 

Goal 6: Work with Colleges and Departments on collection assessments.

Work was completed for a variety of departments for accreditation and CB new program reviews.

 

Goal 7: Complete review of current library system and develop five-year plan.

Participating with the TAMUS Consortia on the replacement of the library system. RFI process completed and request for special funding for replacement part of TAMU-C 1999 legislative request.

 

Goal 8: Ongoing LION Database maintenance

Sound recordings and Media collection added in 1997/98; journal holdings continue to be updated; government documents are added monthly; and final editing of microform collections ongoing.

 

 

Goal 9: Oral History Projects

 

Goal 10: Ongoing maintenance of records retention schedule

We continue to meet system expectation for local records management. Improvements in shelving will be occurring as part of the SpaceSaver Shelving project in fall 1998.

 

Goal 11: Ongoing maintenance of collections

Items are reviewed for repair and/or withdrawal as they circulate.

 

Goal 12: Ongoing exploration of alternative funding for library-related projects

Submissions made to Sprint Foundation liaison, Meadows Foundation, MCI Foundation. Sprint Foundation still open request; others turned down as good projects that the foundations did not have funds to support.

Over 125 multimedia producers approached for sample software for K-12; several have responded with materials valued at over $6,000.

 

Goal 13: Ongoing facilities upgrading and cleaning

Emergency lighting for stairwells and stack areas partially installed by August 1998. Internal information signs reviewed and simplified for a more consistent appearance. Front entry security system replaced and automatic doors upgraded; final construction work to be done in this area during fall 1998 semester.

Major renovation plan created and presented; permission to raise funds received.

Non-traditional Services

Media Services, Campus Engineer, Faculty/Staff Software Training and Instructional Multimedia were in maintenance mode. Major accomplishment was the purchase of CBT Training Software to support the Software Training operation and minimize the work of Instructional Multimedia in the area of creating training materials.