Appendix E-1999/2000 (HEAF)

                   
  Number Unit Total            
Description of Item Requested Requested Cost Cost Rationale for Purchase          
                   
GEE LIBRARY                  
Non-Computer Priorities:                  
Shelving 1 $12,000 $12,000 Collection Growth;          
        Space-Saver for renovation would add another $825,000.          
Microfilm Reader 3 $1,340 $4,020 Replacement equipment (2), New (Special Collections, 1)          
                   
Subtotal:   $16,020              
                   
Computer Priorities:                  
Access Machines in Reference areas (Commerce) 15 $2,000 $30,000 Replacements.          
        1. Increased demand for electronic access.          
        2. Incr. knowledge of electronic products.          
        3. Changes to DRA Lion system to require public PCs.          
Access Machines in Reference areas (Mesquite) 4 $2,000 $8,000 Upgrades and Replacements.ss.          
        1. Increased demand for electronic access.          
        2. Incr. knowledge of electronic products.          
        3. Changes to DRA Lion system to require public PCs.          
Windows NT Workstations 12 $2,500 $30,000 Estimate          
        Upgrade terminals and pre-486 PCs with current std office PC.          
        Easier migration to client/server software when upgrading DRA          
                   
Laptops with networking equipment 15 $4,000 $60,000 Upgrades and Replacements. Hands-on training          
        equipment - including infrared communications cards.          
Laser Printers (Staff and Public) 4 $1,500 $6,000 Upgrades and Replacements. 1. Inc. demand for LAN and Internet use.          
        2. Increased staff needs for printing support.          
        [Metroplex Library, Serials, …]          
Subtotal:   $134,000              
GEE LIBRARY TOTAL:     $150,020.00            
                   
                   
GEE LIBRARY COMPUTER LABORATORY (GENERAL STUDENT ACCESS)                  
                   
Computer Lab Upgrades                  
MAC Upgrades 3 $3,200 $9,600 Upgrades & Replacements          
PC Upgrades 9 $2,000 $18,000 Upgrades & Replacements          
Software and parts upgrades 6 $1,000 $6,000 Upgrades & Replacements          
                   
Subtotal:     $33,600.00 1998/99: $30,000        
                   
TOTAL GEE LIBRARY HEAF EQUIPMENT REQUEST:     $183,620.00 1998/99: $142,106        
                   
                   
LIBRARY MATERIALS                  
Renewals of existing electronic tools and 1 $31,000 $31,000 Projected estimate to continue electronic subscriptions from 1997/98;          
opportunities for new titles,       costs of adding EBSCO Host services to campus tools.          
services and collections                  
Replacement of TAMUS Electronic Tools 1 $70,500 $70,500            
Improved GPO Electronic Access 1 $13,000 $13,000            
Support for Inflationary increase to 10% incr $64,000 $64,000 Projected inflationary estimate for increase to maintain 1998/99 levels.          
Book & Periodicals budget.     $178,500.00 BASE INCREASE REQUEST          
                   
1998/99 Base:     $640,000.00            
Requested BASE Increase:     $178,500.00            
1999/2000 BASE Budget for Library Materials:     $818,500.00            
ACTUAL1999/2000 Library Materials Budget:   $620,000 [McFarland estimate in Spring 1998]            
                   
                   
Total HEAF Equipment:                
$255,660.00 Library Units                
$496,375.00 Library Units plus                
  New ULS                
                   
HEAF COMPARISONS and SUMMARY     LIBRARY ONLY: ALL UNITS:          
  1998/99 Actual:   $782,106.00 $821,081.00          
                   
  1999/2000 Request:   $1,002,120.00 $1,314,875.00          
                   
  1999/2000 Actual:   $803,620.00 $875,660.00          
                   
    or $1,044,335.00 $1,116,375.00          
      with library system upgrade [if added to requests].            
                   
CAMPUS ENGINEER                  
                   
Replacement parts and equipment for Engineer 1 $2,500 $2,500 Replacement and Upgrades          
Engineering Replacement Equipment 1 $5,000 $5,000 Parts and upgraded repair equipment to maintain KETR and campus          
        electronic equipment; maintenance of multimedia classroom equipment.          
                   
Subtotal:     $7,500 1998/99: $7,500        
MEDIA SERVICES                  
                   
Computer Equipment:                  
Computer Projectors 8 $4,980 $39,840 Increase and Update Inventory          
                   
Subtotal:   $39,840              
                   
Non-Computer Equipment:                  
Monitors 27” (S-VHS Input) 10 $495 $4,950 Replace and Update Inventory and Use With DP Link          
TV/VCR Combinations 5 $462 $2,310 Increase Inventory in Satellite Center          
Overhead Projectors 20 $130 $2,600 Replace and Update Inventory: Supply Ed South          
Video Recorder (VCR) 10 $228 $2,280 Increase and Update Inventory          
Cassette Recorders 20 $68 $1,360 Replace and Update Inventory          
Cassette Slide Projectors, case & lense 20 $540 $10,800 Replace and Update Inventory          
Safety Straps 20 $20 $400 Replace and Update Inventory          
Subtotal:   $24,700              
                   
TOTAL:     $64,540 1998/99: $31,475        
                   

Last Updated on 6/17/99
Carolyn Kacena
Director James Gee Library